Turf Field Facility at Beldon Field
The process of inserting a turf
field has begun. These photos will show the progression of the
project as it happens. Click on the photos to see an enlarged
image.
A
diagram of the turf field.
Beldon Field prior to construction.
Heavy equipment arrives.
Pathway to track is removed.
Bringing Beldon Field to subgrade.
Hill regraded, new pathway
established.
Earthmovers encounter rock.
Drainage trenches installed (left side).
Light poles put into
place.
Perimeter curbing formed and
poured.
Electrical conduit installed for lights. North end line curbing poured.
Curbing complete; final laser grade test. The last of the geotech fiber put in place.
Rocks placed
on top of geotech
fiber.
The new turf arrives.
The new bleachers have arrived Rolling out first pieces of turf (8/19/09)
Beldon Field is turning green! (8/19/09) Wednesday evening progress
Rolling down more turf on Wednesday Skeleton of the new bleachers
The stitching of each line has begun Workers stitching on the far side of the field
View of midfield on 8/24/09 The Bleachers are complete
Goucher Logo at Midfield All lines & logo complete 8/27/09
50 percent of rubber fill complete 8/27/09 The endline fences have been installed
Endline view of bleachers Opening night (9/1/09)
more to come...